Call Center Experiences Higher Call Volumes

Plastics Manufacturing Increases Productivity Without Incurring Additional Costs

The Challenge

The client experienced an increase in demand; thus a need to increase productivity without incurring additional labor or capital expenditures while upholding safety, quality, and customer service levels.

Plastics Manufacturing Increases Productivity Without Incurring Additional Costs

About the Client

This global leader in plastics manufacturing provides engineering and design services, mold making, injection molding, and more for the Healthcare, Automotive, Consumer, and Electronics Industries. They operate six facilities around the globe and strive to maintain high standards in safety, quality, and customer service.

Financial Results Snapshot

DB&A Guarantee

  • Proposed Project Cost: $971,250
  • Guaranteed Savings Rate: $2,039,625
  • Guaranteed ROI: 2.1:1

DB&A Delivered

  • Actual Project Cost: $1,298,000
  • Annualized Savings Rate: $5,600,000
  • ROI: 4.2:1

Our Difference

Download the Case Study for deeper insight on the DB&A Difference.



Related Work

Services for Private Equity Firms

This is custom heading element About the Client Private Equity firms do an excellent job analyzing potential investments and current portfolio companies. However, most do not possess the “Shop Floor” operations expertise required to evaluate problems and determine the savings and efficiency improvements available at a potential investment or current holding. In the increasingly competitive...

Planning Improves Productivity

This is custom heading element The Challenge The company had a growing backlog and customers became frustrated with the longer lead times. They reached out to DB&A to help decrease production times, increase profitability, reduce overtime, while achieving established sales targets. About the Client PPC Flexible Packaging™ is a premier high-quality flexible packaging manufacturer dedicated...

Software Project Completed Early

This is custom heading element The Challenge The client was behind schedule for a software development project and over budget. They wanted a “12-week boot camp” in order to maximize the opportunity to meet their project deadline. The client had 152 Software Engineers across Florida, New York, Pennsylvania, and Maryland contributing to the project. About...

6-Month Engagement with Stellar Industries

This is custom heading element DB&A helped Stellar Industries find additional capacity and opportunity in their operations.