Call Center Experiences Higher Call Volumes

Culture Change Energizes Midwest Coal Plant

The Challenge

An energy provider in the Midwest was looking to keep a major fossil fuel powered asset in service amid an ever-increasing reliance on renewable energy. With the reliance on coal decreasing and the costs of generating electricity with coal increasing, the client was struggling to adapt to new operating conditions.

Culture Change Energizes Midwest Coal Plant

About the Client

An energy provider in the Midwest that had recently made a monumental investment in a coal plant.

Financial Results Snapshot

DB&A Guarantee

  • Proposed Project Cost: $1,438,500
  • Guaranteed Savings Rate: $1,566,053
  • Guaranteed ROI: 1.09:1

DB&A Delivered

  • Actual Project Cost: $1,438,500
  • Annualized Savings Rate: $1,805,650
  • ROI: 1.25:1
Related Work

Sausage Manufacturer Experiences 100% Increase in Demand

This is custom heading element CATEGORIES: Case Study, Food, Improved Efficiencies, Machine Utilization, Manufacturing, Productivity / Throughput The Challenge The year 2020 created unprecedented challenges for a sausage manufacturer, who experienced a 100% decline in sales of stadium sausages while seeing an 100% increase in demand in packaged ready-to-eat sausage products sold in grocery stores....

Wood-Working Tools Manufacturing Client Changes Off-Shore Strategy and Meets COVID Demand

This is custom heading element CATEGORIES: Case Study, Distribution, Improved Efficiencies, On-Time Deliveries, Productivity / Throughput, Sales The Challenge The company was facing increasing labor and material costs and had developed a strategic model in which manufacturing capabilities were to be moved overseas. Covid-19 brought new challenges and opportunities beginning in March 2019. The company...

Client Improves Culture, Retains Family Atmosphere

This is custom heading element CATEGORIES: Case Study, Distribution, Improved Efficiencies, Manufacturing, Medical, On-Time Deliveries, Productivity / Throughput The Challenge Despite working excessive amounts of overtime, employees were still not able to meet their on-time delivery schedule or satisfy customer requirements. Orders remained constant, but inventory was building as there were disconnects in their build...

Solving Problems on the Front-Lines

This is custom heading element CATEGORIES: Case Study, Cost Reductions, Improved Efficiencies, Manufacturing, Productivity / Throughput The Challenge At the client's Tennessee location, leadership identified issues concerning culture and behavioral patterns that resulted in inefficient performances causing an impact on the bottom line, profitability. About the Client A global leader in drivetrain and e-Propulsion systems...